Home About Browse
Svenska


Hammarstedt, Elvira and Lareke, Emil, 2026. Parken under marken : omvandling av Källby avloppsreningsverk i Lund. Second cycle, A2E. Alnarp: SLU, Dept. of Landscape Architecture, Planning and Management (from 130101)

[img]
Preview
PDF
90MB
[img]
Preview
PDF
94MB

Abstract

Källby avloppsreningsverk i Lund planeras att avvecklas när stadens avloppsvatten i framtiden leds till Sjölunda avloppsreningsverk i Malmö. Avvecklingen innebär att ett stort område i södra Lund kan få en ny användning. Detta arbete undersöker hur Källby avloppsreningsverk kan omvandlas från en sluten teknisk anläggning till en offentlig park där platsens befintliga strukturer tas till vara och får nya funktioner.

Arbetet har genomförts genom en iterativ designprocess där litteraturstudier, referensprojekt, platsbesök och platsanalys har fungerat som underlag för gestaltningsförslaget. Tre referensprojekt har studerats för att undersöka hur tidigare industriområden och reningsverk har omvandlats och integrerats i offentliga miljöer.

Förslaget utgår från reningsverkets befintliga struktur, med särskilt fokus på bassängerna. Området öppnas upp genom nya entréer och rörelsestråk. Samtidigt får bassängerna nya funktioner och kvaliteter genom öppningar, nivåövergångar och vegetation. Ett antal principer har tagits fram för hur bassängernas väggar och botten kan bearbetas och ny växtlighet tillföras.

Genom att utgå från det som redan finns kan området utvecklas till en offentlig park där spåren av reningsverket fortfarande är tydliga. Förslaget visar en vision för hur Källby skulle kunna utvecklas och kan även inspirera till omvandling av liknande områden efter avveckling.

,

Källby wastewater treatment plant in Lund is planned to be decommissioned as the city’s wastewater will eventually be redirected to the Sjölunda wastewater treatment plant in Malmö. The decommissioning will make a large area in southern Lund available for new uses. This thesis explores how Källby can be transformed from a closed technical facility into a public park where existing structures are preserved and given new functions.

The project was carried out through an iterative design process in which literature studies, reference projects, site visits, and site analysis formed the basis for the design proposal. Three reference projects were examined to explore how former industrial sites and wastewater treatment plants have been transformed and integrated into public spaces.

The design proposal builds on the existing structure and character of the treatment plant, with particular emphasis on its basins. The site is made more accessible through new entrances and pathways, while the basins are given new functions and spatial qualities through openings, transitions between levels, and vegetation. A set of design principles was developed to explore how the walls and floors of the basins can be modified, and new vegetation can be added.

By working with what is already present, the area can be transformed into a public park where traces of the former treatment plant remain visible. The proposal presents a possible vision for the future development of Källby and may also serve as inspiration for the transformation of similar sites following decommissioning.

Main title:Parken under marken
Subtitle:omvandling av Källby avloppsreningsverk i Lund
Authors:Hammarstedt, Elvira and Lareke, Emil
Supervisor:Klich, Christopher and Chojnowski, Kamil
Examiner:Cerwén, Gunnar and Dacke, Peter
Series:UNSPECIFIED
Volume/Sequential designation:UNSPECIFIED
Year of Publication:2026
Level and depth descriptor:Second cycle, A2E
Student's programme affiliation:LY002 Landscape Architecture Programme, Alnarp 300 HEC
Supervising department:(LTJ, LTV) > Dept. of Landscape Architecture, Planning and Management (from 130101)
Keywords:reningsverk, bassänger, industrimiljö, gestaltningsförslag, ruderatmark, Lunds kommun
URN:NBN:urn:nbn:se:slu:epsilon-s-501330
Permanent URL:
http://urn.kb.se/resolve?urn=urn:nbn:se:slu:epsilon-s-501330
Language:Swedish
Deposited On:17 Nov 2026 14:58
Metadata Last Modified:17 Nov 2026 14:58

Repository Staff Only: item control page