Home About Browse Search
Svenska


Femling, Johan, 2010. Uppföljning av planerat skotningsavstånd med hjälp av geografisk informationsteknologi (GIT). Second cycle, A1E. Umeå: SLU, Dept. of Forest Resource Management

[img]
Preview
PDF
1MB

Abstract

The cost of forwarding corresponds to about one tenth of the forestry industries raw material cost. This gives a motive to do good follow-ups to get a good overview of the forwarding distance and, thus, enable improvements. Follow-ups are also justified by the possibility to make more accurate calculations of the harvesting costs, if better estimations of forwarding distance are achieved.

Today (2009) Stora Enso has GPS and vehicle-computers in most of their forwarders. These are used mainly for the forwarder to follow the tracks of the harvester and for the planning leader to see how the forwarder has been driving within the stand. However, the techniques have also other possible uses.

The objective of this Master thesis was to evaluate the planned forwarding distance against the actual forwarding distance in thinned stands and to come up with a method for calculating the actual forwarding distance in GIS-environment.

The data collected was planned forwarding distance (plus the written instructions to the machine operators), odometer forwarding distance and the tracks created by the GPS during the forwarders work. The tracks were then worked up in ArcGIS 9.3 to get a more correct forwarding distance. The planned forwarding distance was evaluated against actually recorded forwarding distance based on odometric and on ArcGIS calculations.

The results show that the planned forwarding distance is substantially underestimated and should be increased by a higher winding coefficient than today (1, 15). The results also indicate that the follow-ups by odometer could be replaced by follow-ups made by the forwarding distance calculated in ArcGIS. However, a condition to make it possible to do the follow-ups in ArcGIS with a reasonable work effort is that there must be precise restrictions on how and when GPS recordings should be done during the forwarding work.

Main title:Uppföljning av planerat skotningsavstånd med hjälp av geografisk informationsteknologi (GIT)
Authors:Femling, Johan
Supervisor:Lindroos, ola
Examiner:Nordfjell, Tomas
Series:Arbetsrapport / Sveriges lantbruksuniversitet, Institutionen för skoglig resurshushållning och geomatik
Volume/Sequential designation:278
Year of Publication:2010
Level and depth descriptor:Second cycle, A1E
Student's programme affiliation:SY001 Forest Science - Master's Programme 300 HEC
Supervising department:(S) > Dept. of Forest Resource Management
Keywords:Skotare, skotningsavstånd, GIS, GPS, trippmätare, slingertillägg
URN:NBN:urn:nbn:se:slu:epsilon-2-413
Permanent URL:
http://urn.kb.se/resolve?urn=urn:nbn:se:slu:epsilon-2-413
Subject. Use of subject categories until 2023-04-30.:Forestry - General aspects
Forestry production
Forest engineering
Language:Swedish
Deposited On:06 May 2010 08:14
Metadata Last Modified:20 Apr 2012 14:12

Repository Staff Only: item control page

Downloads

Downloads per year (since September 2012)

View more statistics